Mr. Lube

Mr Lube

VEHICLE MAINTENANCE FACILITY, LONDON

Constructed in a busy retail park, Mr Lube is the last available pad to be built out. The structure consists of a cast in place concrete basement with pre-cast hollow core planks forming the grade level service bays. Structural steel, metal stud, masonry and EIFS provide the exterior shell above grade. The project includes all process piping and equipment installations for a turnkey building opening.

Owner: Mr Lube Canada
Footprint / Building Size: 4,511 sf
Consultants: Greystone Construction
Delivery Method: Lump Sum
Project Schedule: October 2018 – April 2019